Port
<bdo id="dfagc"><figcaption id="dfagc"><canvas id="dfagc"></canvas></figcaption></bdo><legend id="dfagc"></legend>

    <bdo id="dfagc"><sup id="dfagc"><div id="dfagc"><bdo id="dfagc"></bdo></div></sup></bdo>

      • <bdo id="dfagc"><tbody id="dfagc"></tbody></bdo>

          Saint Mary Road Port Project

          10/20/2017

          The contract for Saint Mary Road Port Project was signed on October 12, 2013. Commenced on November 21, 2012, it is invested by BADEA, OFID and the Government of Madagascar.

          Bata Port Project in Equatorial Guinea

          03/15/2017

          The construction of Bata Port Project started in early February, 2009, and the construction period is 65 months. So far, Bata Port has been all completed; all the unit projects under the contract have been accepted.

          The Counter-Silting Dike Construction & Dredging Project in the Friendship Harbor of Mauritania

          11/19/2015

          The 585.1m-long Friendship Harbor, located at the Nouakchott Atlantic frontage, has been playing the role of the communicative hub of trade transportation in West Africa and it has greatly enhance the economic development of Mauritania and the neighboring countries since the completion of the first phase of the project.

          OYO Inland Wharf Project in Congo-Brazzaville

          11/19/2015

          OYO Inland Wharf Project consists of passenger terminal, freight terminal, storage space and harbor road, house building, pipe network and electric power project etc.. The area covers about 90900 m2, and the wharf face-line is in a straight line whose total length is 494m. The construction formally started on August 21, 2013, and the construction period is 36 months.

          No. 19 Berth in Mombasa

          11/19/2015

          Commenced on March 1, 2011 and with the construction duration of 24 months, it is the first port project of Kenya since 1984, and is also CCCC’s first port project in Kenya.

          Port
          •   10/20/2017

            Saint Mary Road Port Project

            The contract for Saint Mary Road Port Project was signed on October 12, 2013. Commenced on November 21, 2012, it is invested by BADEA, OFID and the Government of Madagascar.

          •   03/15/2017

            Bata Port Project in Equatorial Guinea

            The construction of Bata Port Project started in early February, 2009, and the construction period is 65 months. So far, Bata Port has been all completed; all the unit projects under the contract have been accepted.

          •   11/19/2015

            The Counter-Silting Dike Construction & Dredging Project in the Friendship Harbor of Mauritania

            The 585.1m-long Friendship Harbor, located at the Nouakchott Atlantic frontage, has been playing the role of the communicative hub of trade transportation in West Africa and it has greatly enhance the economic development of Mauritania and the neighboring countries since the completion of the first phase of the project.

          •   11/19/2015

            OYO Inland Wharf Project in Congo-Brazzaville

            OYO Inland Wharf Project consists of passenger terminal, freight terminal, storage space and harbor road, house building, pipe network and electric power project etc.. The area covers about 90900 m2, and the wharf face-line is in a straight line whose total length is 494m. The construction formally started on August 21, 2013, and the construction period is 36 months.

          •   11/19/2015

            No. 19 Berth in Mombasa

            Commenced on March 1, 2011 and with the construction duration of 24 months, it is the first port project of Kenya since 1984, and is also CCCC’s first port project in Kenya.

          Total: 5  Head Prev Next Tail   1 / 1  To   GO 

          银河网上娱乐 |银河娱乐平台 |银河娱乐集团 | |手机版 | | 银河网上娱乐|银河网上娱乐|银河网上娱乐|银河网上娱乐|银河网上娱乐|银河网上娱乐|