Road

  • <tr id="bchfd"></tr>
    <button id="bchfd"><audio id="bchfd"></audio><th id="bchfd"></th><li id="bchfd"></li></button><link id="bchfd"><i id="bchfd"></i><sup id="bchfd"><caption id="bchfd"><th id="bchfd"><keygen id="bchfd"></keygen></th></caption></sup></link>
  • <acronym id="bchfd"><strike id="bchfd"><ins id="bchfd"><q id="bchfd"></q><col id="bchfd"></col><area id="bchfd"><textarea id="bchfd"><select id="bchfd"></select></textarea></area></ins></strike><aside id="bchfd"><meter id="bchfd"><cite id="bchfd"><figure id="bchfd"><datalist id="bchfd"><tfoot id="bchfd"><figcaption id="bchfd"></figcaption><abbr id="bchfd"><address id="bchfd"></address><select id="bchfd"></select><i id="bchfd"><audio id="bchfd"></audio></i></abbr><dd id="bchfd"><optgroup id="bchfd"></optgroup></dd></tfoot></datalist></figure></cite></meter></aside></acronym>

  • <span id="bchfd"></span><abbr id="bchfd"><sub id="bchfd"></sub></abbr>
    1. <dl id="bchfd"></dl><nav id="bchfd"><mark id="bchfd"><col id="bchfd"></col></mark></nav>

      Introduction of Multinational Rwanda-Burundi Road Project LOT4: Mwityazo-Ruvumbu (24.4km)&LOT5: Ruvumbu-Kibuye (41.6km)

      10/09/2017

      Multinational Rwanda-Burundi Road Project LOT4: Mwityazo-Ruvumbu(24.4km)&LOT5:Ruvumbu-Kibuye (41.6km) is located in NYAMASHEKE City and KARONGI City, which KARONGI City is the capital city of the western province of the Republic of Rwanda.

      Alternative North-South Road Project Section Kazarman-Jalal Abad (km291-km433) and Section Balykchy-Aral (km183+500-km195+486) in Kyrgyz

      11/19/2015

      The Second South-North Highway Project in Kyrgyz is 433km long. The construction will greatly improve the highway network in Kyrgyz, enhance the transportation capability of exporting Chinese materials to the surrounding countries such as Uzbekistan, Tajikistan and Kazakhstan and European regions through the land roads of Kyrgyz, and also will further promote the trade contacts between China and Kyrgyz.

      Renovation of Bridges of Seven Roads of the Ministry of Transport, Ecuador

      11/19/2015

      The Project involves seven sub-projects: PIFO-PAPALLACTA Road Expansion Project (36.34km); SAN VICENTE Municipal Works and Coastal Road Project; LAGO AGRIO AV. QUITO Road Renovation Project (6.27km); SANTO DOMINGO Ring Road Small Bridge and Culvert Renovation Project (8 x bridges and 2 x culverts); PUERTO QUITO Small Bridge Renovation Project (6 x bridges); DÉLEG-BAYANDEL Road Renovation Project (7.46km); HUIGRA-PIEDRERO Road Additional Pavement Project (72.8km).

      Odienne-Gbelegban Highway Project in Cote d'Ivoire

      11/19/2015

      The 70.5km-long project is constructed according to the current French standard. Its construction period in the contract is 24 months. After its completion, it will obviously improve the technical condition of the highway network and the road traffic capacity of the area where the project is, and it is of great significance to enhance the function of the regional highway network in Cote d'Ivoire.

      M5 Extension Project in Belarus

      11/18/2015

      M5/E271 Minsk-Gomel Highway Upgrading and Reconstruction Project Babruysk-Zlobin Section is 77.66km long. Its construction formally started on December 1, 2014, and it is scheduled to be completed and opened to traffic in September, 2016.

      Road
      •   10/09/2017

        Introduction of Multinational Rwanda-Burundi Road Project LOT4: Mwityazo-Ruvumbu (24.4km)&LOT5: Ruvumbu-Kibuye (41.6km)

        Multinational Rwanda-Burundi Road Project LOT4: Mwityazo-Ruvumbu(24.4km)&LOT5:Ruvumbu-Kibuye (41.6km) is located in NYAMASHEKE City and KARONGI City, which KARONGI City is the capital city of the western province of the Republic of Rwanda.

      •   11/19/2015

        Alternative North-South Road Project Section Kazarman-Jalal Abad (km291-km433) and Section Balykchy-Aral (km183+500-km195+486) in Kyrgyz

        The Second South-North Highway Project in Kyrgyz is 433km long. The construction will greatly improve the highway network in Kyrgyz, enhance the transportation capability of exporting Chinese materials to the surrounding countries such as Uzbekistan, Tajikistan and Kazakhstan and European regions through the land roads of Kyrgyz, and also will further promote the trade contacts between China and Kyrgyz.

      •   11/19/2015

        Renovation of Bridges of Seven Roads of the Ministry of Transport, Ecuador

        The Project involves seven sub-projects: PIFO-PAPALLACTA Road Expansion Project (36.34km); SAN VICENTE Municipal Works and Coastal Road Project; LAGO AGRIO AV. QUITO Road Renovation Project (6.27km); SANTO DOMINGO Ring Road Small Bridge and Culvert Renovation Project (8 x bridges and 2 x culverts); PUERTO QUITO Small Bridge Renovation Project (6 x bridges); DÉLEG-BAYANDEL Road Renovation Project (7.46km); HUIGRA-PIEDRERO Road Additional Pavement Project (72.8km).

      •   11/19/2015

        Odienne-Gbelegban Highway Project in Cote d'Ivoire

        The 70.5km-long project is constructed according to the current French standard. Its construction period in the contract is 24 months. After its completion, it will obviously improve the technical condition of the highway network and the road traffic capacity of the area where the project is, and it is of great significance to enhance the function of the regional highway network in Cote d'Ivoire.

      •   11/18/2015

        M5 Extension Project in Belarus

        M5/E271 Minsk-Gomel Highway Upgrading and Reconstruction Project Babruysk-Zlobin Section is 77.66km long. Its construction formally started on December 1, 2014, and it is scheduled to be completed and opened to traffic in September, 2016.

      •   11/30/2017

        FM Project in Gabon

        With the overall length of 21.8km and duration of 36 months, the conception and construction project of the link road in Port-Gentil (Forasol-Mbega section) (FM project) is designed with a dual-two lanes road. On February 28, 2016, Gabon’s President personally attended the commencement ceremony. In the late November 2016, the front part of the project with an length of 9.6km, as the main road accessing from Port-Gentil City to the venue to hold the 2017 “African Cup of Nations” was completed on schedule and accepted, providing convenience and easy access for participating teams and fans from all over Africa. On January 9, 2017, under the witness of President Ali Bongo Ondimba, the branch office was awarded Special Contributions to the 2017 “African Cup of Nations” by the Gabonese government.

      Total: 82  Head Prev Next Tail   1 / 14  To   GO 

      银河网上娱乐 |银河娱乐平台 |银河娱乐集团 | |手机版 | | 银河网上娱乐|银河网上娱乐|银河网上娱乐|银河网上娱乐|银河网上娱乐|银河网上娱乐|